logo
call
logo

Schedule Consultation

call+1 (800) 555-0100
Two construction professionals review building plans at a sunny outdoor construction site.

Countersinking Injection System

URETEK (CIS) is a specialized solution designed to address localized soil instability and voids beneath structures. By injecting high-strength polyurethane resin into the ground

HOW COUNTERSINKING WORK

A Simple 3 Steps Process

Our countersinking process is designed to be efficient and effective, ensuring optimal results for your project.

1

Cut Tubes

This leaves the tubes at or just below grade, causing milling machine blades to cut into the steel tubing and preventing asphalt recycling due to contaminants.

2

Drive Tube Deeper

This leaves the tubes at or just below grade, causing milling machine blades to cut into the steel tubing and preventing asphalt recycling due to contaminants.

3

Remove Tube After Injection

This leaves the tubes at or just below grade, causing milling machine blades to cut into the steel tubing and preventing asphalt recycling due to contaminants.

WHY UDI PRESERVE STRUCTURAL BOND

Built to Maintain. Engineered to Protect.

UDI Preserve Structural Bond is a cutting-edge solution designed to maintain the integrity of structures while providing exceptional protection against environmental factors. Our innovative technology ensures that your structures remain strong and durable.

A cross-section diagram shows different soil layers with a metal rod inserted vertically.

1

NO DISTURBANCE TO SOIL STRUCTURE

The soil's geopolymer matrix remains intact-no cutting, no vibration.

2

MAINTAINS COMPACTION

Preserves the soil's density and load-bearing capacity for long-term performance.

3

PRESERVES BONDS & INTEGRITY

Uniquely formed bonds in the soil are not broken, maintaining structural stability.

4

CONTROLLED & PRECISE INJECTION

Polymer is injected exactly where needed, reinforcing the soil without disruption.

WHY COUNTERSINKING

BENEFITS OF COUNTERSINKING

Gauge with a red needle indicating high speed or maximum performance.

Rapid Repair

Our repair process is fast and efficient, minimizing downtime and disruption to your operations. Due which we are able to complete repairs in a fraction of the time.

Gauge with a red needle indicating high speed or maximum performance.

LONG-LASTING RESULTS

Our repair process is fast and efficient, minimizing downtime and disruption to your operations. Due which we are able to complete repairs in a fraction of the time.

Gauge with a red needle indicating high speed or maximum performance.

HYDRO INSENSITIVE

Our repair process is fast and efficient, minimizing downtime and disruption to your operations. Due which we are able to complete repairs in a fraction of the time.

Gauge with a red needle indicating high speed or maximum performance.

COST SAVING

Our repair process is fast and efficient, minimizing downtime and disruption to your operations. Due which we are able to complete repairs in a fraction of the time.

Gauge with a red needle indicating high speed or maximum performance.

HISTORY OF SUCCESS

Our repair process is fast and efficient, minimizing downtime and disruption to your operations. Due which we are able to complete repairs in a fraction of the time.

Gauge with a red needle indicating high speed or maximum performance.

ECO-FRIENDLY

Our repair process is fast and efficient, minimizing downtime and disruption to your operations. Due which we are able to complete repairs in a fraction of the time.

et Expert Help Fast. Talk to a URETEK Specialist.

Tell us your site issue and get a reliable solution plan from our team.

Get Free Assessment

URETEK

Ground improvement solutions engineered for performance.

Contact Us

Get a Quote

Phone
Address

123 Main St, Dallas, TX


Privacy PolicyTerms of ServiceSitemap
linkedin iconfacebook icon

© 2026 © 2026 Uretek. All rights reserved.