logo
call
Settlement Control hero

Settlement Control

A structure that settles doesn't settle evenly. Settlement Control corrects that differential settlement by stabilizing the weak soil beneath it and lifting the structure back toward grade.

Solutions for this Service

Settlement Remediationarrowactive arrow

Structural Re-Levelingarrowactive arrow

Foundation Stabilizationarrowactive arrow

Infrastructure Settlement Controlarrowactive arrow

Related Industries

Transportationarrowactive arrow

Commercial and Institutionalarrowactive arrow

Need a Site Assessment?

call icon

800-240-7868

Smiling woman in a yellow hard hat and suit jacket points up, holding blueprints.

A structure that settles doesn't settle evenly. One section drops while another stays put, and the difference shows up as a dip in pavement, a crack in a slab, or a gap where a bridge deck meets the road. Settlement Control corrects that differential settlement by stabilizing the weak soil beneath it and lifting the structure back toward grade. Engineers, private owners, and public agencies use it on bridges, pavement, and building foundations that have already started to settle unevenly.

Settlement Control feature

Problems Settlement Control Solves

Differential settlement doesn't stop on its own. Here's what it leads to if it's not corrected.

White checkmark symbol within a bright red circular background, indicating completion or success.

Uneven pavement or slabs that create trip hazards or unsafe driving conditions

White checkmark symbol within a bright red circular background, indicating completion or success.

A gap or step forming where a bridge deck, approach slab, or building meets the surrounding grade

White checkmark symbol within a bright red circular background, indicating completion or success.

Cracking in foundations, slabs, or pavement caused by one section settling faster than another

White checkmark symbol within a bright red circular background, indicating completion or success.

Drainage problems created by low spots where water used to flow evenly

Settlement Control feature

Key Signs You Need Settlement Control

Differential settlement usually shows itself gradually before it becomes a hazard. Watch for these.

White checkmark symbol within a bright red circular background, indicating completion or success.

A noticeable dip or step where a bridge approach meets the road

White checkmark symbol within a bright red circular background, indicating completion or success.

Cracks radiating from one section of a slab or pavement while the rest stays intact

White checkmark symbol within a bright red circular background, indicating completion or success.

Doors or windows that no longer close properly in a building with a settled foundation

White checkmark symbol within a bright red circular background, indicating completion or success.

Water pooling in a low spot that used to drain evenly

White checkmark symbol within a bright red circular background, indicating completion or success.

A joint or seam that has visibly separated or become misaligned

White checkmark symbol within a bright red circular background, indicating completion or success.

One side of a structure sitting noticeably lower than the other

Settlement Control keysigns

Benefits of Settlement Control

Why agencies and property owners choose Settlement Control over full reconstruction.

White checkmark symbol within a bright red circular background, indicating completion or success.

Corrects settlement that has already happened, not just soil that might settle later. The injection both densifies the weak soil and lifts the structure above it back toward its original grade in the same process.

White checkmark symbol within a bright red circular background, indicating completion or success.

Reduces the safety risk of an uneven surface. Correcting a settled bridge approach, slab, or pavement section removes the trip and driving hazard before it causes an incident.

White checkmark symbol within a bright red circular background, indicating completion or success.

Keeps the structure in use during the work. At State Fair Community College in Missouri, URETEK corrected foundation settlement in just two days with minimal disruption for the building's occupants.

White checkmark symbol within a bright red circular background, indicating completion or success.

Works fast, even on major infrastructure. URETEK's repairs to the Sault Sainte Marie International Bridge abutments were completed on both sides of the bridge in only two days.

White checkmark symbol within a bright red circular background, indicating completion or success.

The polymer both stabilizes and lifts in a single mechanism. URETEK 486 Star® expands up to 20 times its original volume once injected, densifying the soil that caused the settlement while applying enough controlled pressure to raise the structure above it.

Why Choose Settlement Control?

Settlement Control is the right call when a structure has already settled unevenly and needs to be corrected and lifted back toward grade, not just strengthened for the future. It's built for bridge approaches and abutments, highway and parking lot pavement, and building foundations that show a visible dip, step, or crack from differential settlement.

It's not the right tool when the soil hasn't settled yet and the goal is preventing future settlement in weak but currently stable ground; Soil Stabilization is the better starting point for that. It also isn't the fit when the issue is seismic risk to soil that could liquefy during an earthquake, which Liquefaction Mitigation addresses directly, or when there's a confirmed open void beneath the structure rather than general settlement, which Void Filling is built to handle.

Settlement Control is often paired with Joint Sealing when the settlement has opened up a joint or crack that also needs to be sealed against water infiltration, since correcting the settlement alone won't stop water from continuing to erode the soil through an open joint.

Our Approach

1

Evaluate

A URETEK project manager studies the settlement and reviews soil conditions on site, not a salesperson working from a standard package.

2

Deploy

Crews mobilize on the schedule the site needs, including nights, weekends, or holidays, in a self-contained unit.

3

Drill

Small holes are drilled in a pattern designed around the structure's load and the extent of the settlement.

4

Inject

URETEK 486 Star® is injected and expands up to 20 times its original volume, densifying the soil and lifting the structure back toward grade.

5

Clean Up

There's no excavation to backfill and no trench to restore, so cleanup is minimal.

6

Validate

The client confirms the surface is stable and back to grade before the crew leaves.

Trusted by Engineers and Agencies Nationwide

URETEK has corrected settlement for state departments of transportation, colleges, and international bridge authorities nationwide.

Logo for Los Angeles World Airports (LAWA) with blue 'LA' and black 'WA' text.Caltrans logo with intertwined blue and teal 'C' and 'T' letters above 'Caltrans' text.City of Springfield logo with a stylized blue and gray 'S' graphic.WVDOH Division of Highways logo featuring a West Virginia map and bridge.NTTA logo with "North Texas Tollway Authority" text in blue and green.Official seal of the City of Houston, Texas, featuring a gold train and star.

Frequently Asked Questions

URETEK 486 Star® cures to 99% of its final strength within minutes, so it isn't a slow-setting fill that keeps shifting after the crew leaves. On the Sault Sainte Marie International Bridge, URETEK's repairs to the abutments cost about 1% of what a full reconstruction would have run, and Public Works and Federal projects carry a two-year warranty on top of that.

URETEK 486 Star® is injected beneath the settled slab or structure and expands up to 20 times its original volume, both densifying the weak soil that caused the settlement and applying enough controlled lift to raise the structure back toward its original grade in the same process.

In most cases, yes. On I-81 in Binghamton, New York, URETEK corrected up to three inches of settlement across a 122-foot by 60-foot section of highway and completed the project 60 percent under budget compared to a full reconstruction.

Yes. At State Fair Community College in Sedalia, Missouri, URETEK corrected foundation settlement in just two days with minimal disruption for the building's occupants. On highway and bridge projects, crews can work nights, weekends, or holidays to avoid closing the road during normal traffic hours.

Settlement Control is used on bridge approaches and abutments, highway and parking lot pavement, building foundations and slabs, and other structures wherever differential settlement has created an uneven or unsafe surface.

Don't let settlement get worse.

Get a settled slab, pavement section, or foundation evaluated before the gap gets bigger. URETEK crews respond fast, including emergencies.

Request a Settlement Evaluation

URETEK

Ground improvement solutions engineered for performance.

Contact Us

Find Local Experts

Phone
Address

13900 Humble Road, Tomball, TX 77375


Privacy PolicyTerms of ServiceSitemap
linkedin iconfacebook icon

© 2026 Uretek. All rights reserved