Utilities and public works assets, weigh stations, pond embankments, municipal buildings, carry daily traffic and constant use on soil that eventually gives way. When it does, the fix usually falls to a city or county department already managing a long list of priorities, and it often can't wait. URETEK stabilizes the ground beneath municipal infrastructure through small-hole polymer injection, restoring support fast, including as emergency response work, without excavation or extended closures.
Municipal assets share three pressures, whether the asset is a utility site or a public works facility.
Settlement and erosion on public assets, weigh stations, pond embankments, municipal buildings, that carry constant daily traffic and use
Repairs that a city or county department needs fixed fast, sometimes as emergency response, without the budget or time for full reconstruction
Coordinating repair work directly with a public works or utilities department, whose own schedule and priorities shape the project

The affected slab, embankment, or structure is evaluated on site, often in direct coordination with the city or county department responsible for it.
Injection design is built around the specific asset and its public use, whether that's a weigh station's traffic pattern or a pond bank's erosion history.
Work is completed through small-hole injection, keeping the facility or public asset in use and minimizing disruption to the department's own operations.

At a landfill weigh station in Broome County, New York, entrance and exit slabs had settled enough to create unsafe traffic conditions. URETEK stabilized the subsoils, lifted the slabs, and aligned the joints, restoring safe traffic conditions rather than just patching the visible settlement.
Directly, when that is how the project is structured. In Missouri City, Texas, URETEK worked with the city's Public Works Department on an ongoing erosion problem along an effluent pond bank, injecting structural polymer at more than 100 sites to create a 500-foot underground curtain along the affected banks.
In most cases, yes, since the fix works around the existing slab or embankment rather than removing and rebuilding it. The Broome County landfill weigh station repair was completed in less than two days.
Usually, yes. The landfill weigh station repair in Broome County kept the facility operating with only a brief, controlled interruption during the two-day repair rather than an extended shutdown.
Crews can mobilize on short notice for emergency municipal work. The Missouri City, Texas effluent pond bank repair was recognized as an award-winning emergency response, addressing an erosion problem that had been an ongoing concern for city officials before URETEK's structural polymer curtain resolved it.
Get your utility site or public works asset assessed by a team that works directly with municipal departments.
Request Proposal
URETEK
Ground improvement solutions engineered for performance.
Contact Us
Find Local Experts
13900 Humble Road, Tomball, TX 77375
Services
Solutions